07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

splits and rejects selected from various holes for this purpose. In total, results from 442 data<br />

pairs were reviewed for this period and are presented in Figure 12.32: Pulp Splits and Reject<br />

Duplicate Samples - Ag G/T (N=442), Figure 12.33: Pulp Splits and Reject Duplicate<br />

Samples - Pb % (N=442) and Figure 12.34: Pulp Splits and Reject Duplicate Samples – Zn<br />

%(N=442) for Ag, Pb and Zn respectively. A high degree of correlation exists between<br />

sample pairs for all three metals and all show 0.999 correlation coefficients. Analytical results<br />

included in the check sample program were determined at the ALS facility in La Serena,<br />

Chile and original project results were from the ALS facility in Lima, Peru. Since January<br />

2010 and starting at PUD 140 all second laboratory cross check analysis are done at SGS in<br />

Lima Peru.<br />

Figure 12.32: Pulp Splits and Reject Duplicate Samples - Ag G/T (N=442)<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 86

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!