<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

16.9 Mining Productivity<br />

16.9.1 Mine Operating Schedule<br />

The production elements of the <strong>Pulacayo</strong> mine will operate on a 24/7 basis. The mine is<br />

scheduled to operate two 10 hour shifts per day over a period of 345 days per annum. This<br />

results in a total of 6,900 gross operating hours per annum.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />