07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

11.3 Drill Core Analysis from 2006 to 2012 <strong>Apogee</strong> Programs 61<br />

11.4 Drill Core Analysis from 2002 to 2003 ASC Programs 62<br />

11.5 Quality Assurance and Control from 2006 to 2012 <strong>Apogee</strong> Programs 62<br />

11.6 Quality Control and Assurance for ASC 2002-2003 Programs 63<br />

12 DATA VERIFICATION 64<br />

12.1 Review and Validation of <strong>Project</strong> Data Sets 64<br />

12.2 Site Visits by Mercator 64<br />

12.3 Quality Control and Quality Assurance (QAQC) 68<br />

13 MINERAL PROCESSING AND METALLURGICAL TESTING 97<br />

13.1 Resource Development Inc (RDi) Metallurgical Test Program (Stage 1) 97<br />

13.2 UTO Metallurgical Test Program (Stage 2) 100<br />

13.3 ED&ED Lab Metallurgical Test Program (Stage 3) 105<br />

13.4 FLSmidth Paste Thickening Testwork 106<br />

13.5 SGS Lead and Zinc Concentrate Assays 107<br />

13.6 Concentrate Filtration Test work 107<br />

13.7 UTO Metallurgical Test program (Stage 4) 107<br />

13.8 MAELGWYN Metallurgical Test program (Stage 4) 109<br />

14 MINERAL RESOURCE ESTIMATE 112<br />

14.1 General 112<br />

14.2 Geological Interpretation Used In Resource Estimation 112<br />

14.3 Methodology of Resource Estimation 113<br />

15 MINERAL RESERVES 142<br />

15.1 Introduction 142<br />

15.2 Methodology 142<br />

15.3 Stope Generation and Mining Cut-off Grades 142<br />

15.4 Modifying Factors 143<br />

15.5 Mineral Reserves 143<br />

15.6 Comparison of Resource to Reserve 144<br />

16 MINING 144<br />

16.1 Mining Method Selection 144<br />

16.2 Mine Design and Layout 145<br />

16.3 Mine Production 151<br />

16.4 Hydrogeology 152<br />

16.5 Geotechnical 152<br />

16.6 Mine Development 154<br />

16.7 Backfill 156<br />

16.8 Ventilation 158<br />

16.9 Mining Productivity 160<br />

16.10 Mine Equipment Fleet Requirements 163<br />

16.11 Manpower Requirements 164<br />

16.12 Underground Infrastructure and Mine Services 166<br />

17 RECOVERY METHODS 168<br />

17.1 Process Design Criteria 168<br />

18 INFRASTRUCTURE 181<br />

18.1 Site Roads 181<br />

18.2 Power Supply 181<br />

18.3 Power Distribution 184<br />

18.4 Site Buildings 186<br />

18.5 Water Storage and Distribution 187<br />

18.6 Sewage Collection 189<br />

18.7 Communications 189<br />

18.8 Fuel and Lubricant Storage and Distribution 189<br />

18.9 Tailings Disposal Facility 189<br />

18.10 Waste Rock Management 205<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page ii

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!