<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Item Description Detail<br />

12 EPCM<br />

13 Indirect Costs<br />

It is based on quotes from contractor’s and/or ratios in<br />

accordance with the TWP database of similar projects<br />

It is based on quotes from suppliers and/or ratios that are<br />

according to the TWP database of similar projects<br />

21.1.1.2 Direct Costs<br />

Direct costs include all new equipment, material, and installation of permanent facilities<br />

associated with the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Mine equipment fleet<br />

Mine ventilation equipment<br />

Underground workshop equipment<br />

Backfill plant/system equipment<br />

Crushing, material handling and processing facilities<br />

Process buildings<br />

Plant mobile equipment<br />

Infrastructure roads and site preparation<br />

Power supply and distribution<br />

Concentrate load out<br />

Pre-production mining<br />

Tailings storage area<br />

Warehousing<br />

Administration<br />

Truck shop (underground mine)<br />

Yard services and other utilities<br />

Control and communications systems<br />

Fuel storage<br />

Magazine (explosives storage)<br />

The direct costs are referred to the expenses directly incurred during the physical development of<br />

the project, including the processing equipment, materials take-off (MTO’s), rates for construction<br />

(labor for construction and supervision), construction equipment, contract services, transportation<br />

costs, assembly and installation of infrastructure, civil works metered (concrete, structural steel,<br />

coverage), piping, electric equipment (substations, transmission and distribution lines).<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 260

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!