<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

LIST OF TABLES<br />

Table 1.1: <strong>Pulacayo</strong> Deposit Mineral Resource, Prepared by Mercator – Effective 28<br />

September 2012 5<br />

Table 1.2: Mineral Reserve Statement prepared by TWP - Effective 17 January 2013 7<br />

Table 1.3: LOM Initial Capital Estimate 9<br />

Table 1.4: LOM Sustaining Capital Estimate 10<br />

Table 1.5: LOM Total Operating Costs 10<br />

Table 1.6 Key Assumptions and Results from the TFM 11<br />

Table 2.1: Responsibility Matrix 14<br />

Table 9.1: Historic MICON Mineral Resource Estimate - Effective 28 October 2008 51<br />

Table 9.2: Historic MICON Mineral Resource Estimate - Effective 14 October 2009 51<br />

Table 9.3: Historic <strong>Pulacayo</strong> Deposit Mineral Resource – 19 October 2011 52<br />

Table 12.1: Certified Reference Materials Data for January 2010 to October 2011 Period 69<br />

Table 12.2: Collar Coordinate Check Program Results 96<br />

Table 13.1 Sample Composite Grades and Head Assays 98<br />

Table 13.2 First Sample Composite Set Grades and Head Assays 101<br />

Table 13.3 Bond Ball Work Index Tests Results Summary 101<br />

Table 13.4 Specific Gravity Testwork Summary 102<br />

Table 13.5 Second Sample Composite Set Grades and Head Assays 105<br />

Table 13.6 Fourth Sample Composite Head Core Grades and Assays 108<br />

Table 13.7 Samples Assays 110<br />

Table 14.1: <strong>Silver</strong>, Lead and Zinc Statistics for Uncapped 1 m Composites 124<br />

Table 14.2: <strong>Silver</strong>, Lead and Zinc Statistics for Capped 1.0 m Composites 124<br />

Table 14.3: Summary of <strong>Pulacayo</strong> Deposit Block Model Parameters 130<br />

Table 14.4: Density Statistics for 1 m Composites in Peripheral Domain Sulphide Zone 131<br />

Table 14.5: Density Statistics For 1 m Composites in Peripheral Domain Oxide Zone 131<br />

Table 14.6: <strong>Pulacayo</strong> Deposit Mineral Resource – Effective 28 September 2012 137<br />

Table 14.7: <strong>Pulacayo</strong> Uncapped Underground Resource – 28 September 2012 138<br />

Table 14.8: Comparison of Drillhole Composite Grades and Block Model Grades 141<br />

Table 14.9: Additional Resource Parameters for Ordinary Kriging Check Model 141<br />

Table 15.1: Mineral Reserve Statement prepared by TWP – Effective Date 17 January 2013 143<br />

Table 15.2: Indicated Resources versus Probable Reserves 144<br />

Table 16.1: Annual Mining Schedule 152<br />

Table 16.2: Tendon Support Requirements for Different Excavations 154<br />

Table 16.3: Mechanical Availability 162<br />

Table 16.4: Effective Operating Hours 162<br />

Table 16.5: Trackless Equipment Owned by <strong>Pulacayo</strong> Mine 163<br />

Table 16.6: Additional Primary Trackless Equipment 164<br />

Table 16.7: Additional Primary Trackless Equipment 164<br />

Table 16.8: Annual Manpower Requirements for <strong>Pulacayo</strong> Mine 165<br />

Table 17.1: Process Design Basis 168<br />

Table 17.2: Reagent Consumption 175<br />

Table 18.1: Tailings to the TSF by Year 190<br />

Table 18.2: TSF Design Criteria 193<br />

Table 18.3: Precipitacion (mm) 201<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page iv