07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

compensatory measures properly implemented that will serve to prevent, reduce, and eliminate<br />

or compensate the expected changes.<br />

20.4.1.1 Air<br />

From the analysis conducted, it is established that the activities of the <strong>Pulacayo</strong> Mining <strong>Project</strong><br />

will have the following main environmental impacts:<br />

<br />

Alteration of air quality by the generation of particulate matter.<br />

<br />

Change in air quality by generating combustion gases.<br />

These environmental impacts have negative characteristics with an assessment of moderate to<br />

critical, therefore specific measures need to be done, whether preventive, corrective or<br />

compensatory according to each case for mitigation.<br />

In the case of particulate matter generated by drilling and blasting, the effects can be minimized<br />

by implementing a ventilation system inside the mine, which must be consistent with the<br />

engineering of the project, can be from simple chimneys to systems of injection and extraction of<br />

air. In any case, it should be verified that the final output does not exceed the permissible limits of<br />

quality and aspects such as population and downwind direction should be considered. There is<br />

also the application of wet drilling techniques and the implementation of dust traps at the mouth<br />

of the drills.<br />

20.4.1.2 Soil<br />

Among the most significant environmental impacts that would affect the ground, we have:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Changes to soil quality by inappropriate disposal of domestic solid waste.<br />

Changes to soil quality from spills of fuels and lubricants.<br />

Alteration of soil levels structure.<br />

Soil compaction.<br />

Alteration of soil quality due to the accumulation of waste material in dumps.<br />

Alteration of soil quality for tailings disposal.<br />

Changes to soil quality from spills of hazardous substances.<br />

Changes to soil quality by improper final disposal of special solid waste (accessories and<br />

spare parts for vehicles and machinery, discarded tires, non-hazardous solid sanitary<br />

waste, debris).<br />

Possible soil erosion due to loss of vegetation layer.<br />

<br />

Alteration of soil quality due to sedimentation of heavy metals from DAM (Mine Acid<br />

Drainage) and DAR (Rock Acid Drainage).<br />

Negative impacts previously mentioned, only three reach the Critical category.<br />

Among the preventive measures, it is intended to do:<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 246

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!