07.05.2015 Views

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

Pulacayo Project Feasibility Study - Apogee Silver

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

<br />

may provide an additional revenue stream is important because recovery of silver<br />

may substantially enhance project value. Ultimately, optimization of all project areas<br />

to provide the best combined mine and process components and configurations will<br />

reduce cost and enhance operating efficiencies.<br />

Current arrangements for <strong>Project</strong> access, communication, power and water supply<br />

and labor are sufficient to carry out year-round exploration activities, and with the<br />

necessary upgrades, the same means can be reasonably expected to meet needs<br />

for <strong>Project</strong>.<br />

TWP and <strong>Apogee</strong> identified a number of potential plant design optimizations that<br />

could be investigated to save plant CAPEX and to reduce the complexity of the plant.<br />

26 RECOMMENDATIONS<br />

The <strong>Feasibility</strong> <strong>Study</strong> indicates a robust <strong>Project</strong> and TWP recommends that the <strong>Project</strong><br />

advance to the basic/detailed engineering stage in support of the Construction of a mine and<br />

Process facilities.<br />

The TWP recommendations are summarized as follows:<br />

26.1 Geology<br />

<br />

<br />

<br />

Additional exploration drilling is recommended to improve the confidence in indicated<br />

resources, especially in the parts of the deposit that are early in the production<br />

schedule.<br />

Additional exploration drilling is also recommended to assess opportunities for<br />

extension of the deposit limits both along strike and down dip.<br />

The resource model should be updated to include any drilling conducted after the<br />

completion of the mineral resource estimates included in this study. As new<br />

information regarding the mineral resource and economic parameters, the reserves<br />

shall be updated<br />

26.2 Mining<br />

26.2.1 Geotechnical<br />

<br />

<br />

Additional geotechnical study is required to support the basic/detailed engineering.<br />

Geotechnical work should include site investigation, trenching, drilling, topography<br />

and slope stability modeling for all surface installations including the plant site,<br />

campsite, waste dumps and tailings disposal facilities.<br />

As more underground geotechnical information becomes available, a rock mechanics<br />

analysis should be conducted to re-assess the backfill material for mined out stopes,<br />

which could reduce backfill costs.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 293

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!