<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

<br />

In general, the work describe next will help advance the project to the basic/detailed<br />

engineering stage: Spatial variations in key geomechanical characteristics,<br />

geomechanical drill holes, lab strength testing and numerical modeling.<br />

26.2.2 Hydrogeology<br />

<br />

<br />

<br />

<br />

<br />

A field investigation campaign including additional hydrogeology drill holes and<br />

piezometer installation.<br />

Acquire water inflow data during tunnel excavation.<br />

Compile a detailed numerical hydrogeological modeling of mine inflows.<br />

Perform in-depth hydrogeological studies to determine the groundwater inflow and<br />

quality as well as to define fissure water underground.<br />

Further study on hydrogeological conditions are needed for estimating water handling<br />

and underground pumping requirements.<br />

26.2.3 General<br />

<br />

<br />

<br />

<br />

The mobile capital and operating costs require further refinement with manufacturer<br />

specific data for spare parts and major rebuilds.<br />

From a mine planning standpoint, TWP recommends an in-depth examination of the<br />

factors that contribute the most to the cost or mined material head grade.<br />

Modify the mine plan to include increased resources and identify areas of the mine<br />

amenable to lower cost bulk mining methods.<br />

Prepare a mine dewatering plan to comply with safety plans during operation.<br />

26.3 Metallurgy and Mineral Processing<br />

<br />

<br />

<br />

<br />

<br />

Conduct additional variability test work to further optimize the flow sheet and reagent<br />

suite to ensure the concentrates specifications are optimized.<br />

Pilot plant pumping tests for cemented paste fill.<br />

An opportunity exists to optimize process related capital and operating costs. These<br />

include an alternate crushing design furnished with a scrubber for clays washing and<br />

handling instead of having high pressure nozzles for clays washing.<br />

Further mineralogical analysis (QUEMSCAN) of the deposit to further understand the<br />

mineralogy throughout the deposit. Further explore the potential influence of the<br />

presence of variable amounts of copper in the ore in flotation lead and zinc<br />

selectivity.<br />

Lead and zinc concentrates filtration tests at the selected mill grind size are required<br />

to confirm the filter sizing, the type of filter and attainable cake moisture.<br />

26.4 Infrastructure<br />

<br />

<br />

Additional engineering work including updates of mechanical, civil, electrical and<br />

instrumentation design are recommended for the basic/detailed engineering phase.<br />

A detailed <strong>Project</strong> Execution Plan will be developed during the basic/detailed<br />

engineering work.<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 294

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!