<strong>Pulacayo</strong> 1 000 t/d Phase I <strong>Feasibility</strong> <strong>Study</strong> - NI 43-101 Technical Report<br />

090644-3-0000-20-IFI-100<br />

Table 1.4: LOM Sustaining Capital Estimate<br />

Sustaining Capex<br />

LOM Capex, USD<br />

Process Plant 1,484,581<br />

Tailings Storage Facility (TSF) 5,248,294<br />

Mining<br />

Mining Development 16,599,077<br />

Mining Equipment 8,450,907<br />

Mining Services 2,682,431<br />

Mining Backfill System 1,318,427<br />

Site Development 10,000<br />

EPCM 258,119<br />

Freight Taxes and Insurance 670,074<br />

Inventory & Commissioning 155,947<br />

Owner Costs 3,332,000<br />

Sub Total Sustaining Capex 40,209,855<br />

Contingency 929,100<br />

Total Sustaining Capex 41,138,956<br />

Total Sustaining Capex, USD/ore t processed 11.7<br />

1.8.2 Operating Costs<br />

Operating costs (OPEX) were estimated in constant 2Q USD. The LOM operating cost is<br />

USD 54.9/ton of ore processed. The OPEX includes costs for mining, processing and<br />

general and administration. Table 1.4 presents a summary of the life-of-mine total operating<br />

costs.<br />

Table 1.5: LOM Total Operating Costs<br />

Total OPEX Cost<br />

LOM OPEX, USD<br />

Mining 107,768,344<br />

Processing 53,464,419<br />

General and Administration 31,729,025<br />

Total OPEX Costs 192,961,787<br />

OPEX, USD/ore t mined 54.2<br />

OPEX, USD/ore t processed 54.9<br />

TWP Sudamérica S.A. Av. Encalada 1257 Of. 801, Santiago de Surco Lima 33, Perú (51-1) 4377473<br />

Page 10