a. Infrastructure projectsList of planning dates function changes Infrastructure projects to end 2019DescriptionRealisationapprovalPlanneddateReviseddateCommissioningfeasibilityAmsterdam - The Hague - Rotterdam – DordrechtHaarlem, stabling and service capacity Yes June 2013 CertainHoofddorp stabling yard, extend track 211 2012 p.m. IV <strong>2014</strong> ProbableHoofddorp stabling yard, expand2012 p.m. 2017 Probablestabling capacity and extend routeRijswijk - Delft, Spoorzone Delft (2-track tunnel) Yes II 2015 ProbableRijswijk - Delft, Spoorzone Delft (4-tracks) Yes 2017 ProbableAmsterdam - Utrecht - Maastricht/HeerlenAcht railway yard, realise depot power supply (2x) Yes I <strong>2014</strong> Apr 2013 ProbableGeldermalsen; signals modification at Culemborg,Geldermalsen and MeterenYes July 2013 CertainMaastricht, realise depot power supply (2x) Yes p.m. Apr 2013 CertainEindhoven, speed improvement southside (2nd Yes Apr 2013 Certainphase HPS)'s-Hertogenbosch, flyover northside + modify layout Yes III <strong>2014</strong> Uncertainrailway yardFree flow Station Utrecht Total DSSU (PHS) 2012 IV 2015 UncertainGeldermalsen: access Merwede Linge Line 2012 2018 ProbableVleuGel: Houten-Houten Castellum; reverse point Yes Oct 2012 Certainalong platformVleuGel; at Utrecht OZ: reduce speed from 80 km/h Yes Dec 2012 Certainto 60 km/hVleuGel; Utrecht Central - Utrecht Lunetten (4 tracks) Yes IV 2015 UncertainVleuGel; Utrecht Lunetten – Houten (4 tracks) Yes IV 2015 UncertainVleuGel; at OZ: raise speed from 60 km/h to 80 km/h Yes IV 2015 UncertainVleuGel; Utrecht (Amsterdam Rijnkanaal) -Utrecht Central (4 tracks)2012 2018 UncertainAmsterdam/Schiphol - Den HelderAlkmaar; realise low service paths 2012 II <strong>2014</strong> UncertainUitgeest; extra stabling facility 2012 2018/-20 UncertainAmsterdam/Amersfoort - Zwolle – GroningenHarderwijk; reversing facility 2012 2016 UncertainHoogeveen, speed increase 2012 2015 2019 UncertainZwolle, realise 4th platform and platform tunnel Yes Dec 2012 Certain(limited functionality)Zwolle, realise 4th platform and platform tunnel (full Yes p.m. III <strong>2014</strong> Certainfunctionality)Hanze line: double track connection Lelystad - Zwolle Yes Dec 2012 CertainAmersfoort realise flyover westside Yes Dec 2012 Jun 2013 UncertainDeventer: new side platform final solution Yes Dec 2013 ProbableGroningen Spoorzone 2012 2019 ProbableMeppel, extend train service Leeuwarden-2012 May 2013 ProbableWolvega to MeppelRails in Assen Yes Dec <strong>2014</strong> ProbableGroningen, tram arrival at main station 2012 IV <strong>2014</strong> Uncertainappendix 10 Infrastructure projects and studies - Section a: Infrastructure projects<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 134

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!