13.07.2015 Views

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

administrative action and does not imply any change to the capacity rights. The commencementdates of the change sheets are determined by <strong>ProRail</strong>, following consultation with railwayundertakings and foreign infrastructure managers.e. Catalogue paths for international freight transport offered in RNE context and paths designated by<strong>ProRail</strong> in determining the annual timetable (BIT paths) remain reserved for this use up to deliveryto traffic control. RNE publishes pre-arranged-paths on the international freight corridors 1(Rotterdam-Genoa) and 2 (Rotterdam-Lyon). Insofar as these paths have not been requested inthe timetable, they remain available specifically for allocation by these corridor one-stop-shopsuntil the time of transfer to the traffic control organisation.f. Pursuant to Regulation (EU) No. 913/2010, railway undertakings must take into account that trainpaths on the international freight corridors 1 and 2 fall under the responsibility of the relevantcorridor organisations.Traffic changes due to management (VAB process)a. <strong>ProRail</strong> is responsible for the rescheduling of traffic for management purposes.b. The VAB process is subject to the rules that apply to ad hoc applications.c. <strong>ProRail</strong> will between 19 and 12 weeks before the start of work initiate coordination with thetitleholders in order to agree on a specification of traffic to be rescheduled. The objective is tooptimally allocate the detour requirement making use of the rest capacity of the detour routesections.d. <strong>ProRail</strong> manages the process of specifications for alternative timetables to ensure coordinationand timely availability (around 9 weeks before implementation).e. <strong>ProRail</strong> can process minor changes to the specifications (within the mandate provided by thetransport operators), without disturbing the commercial and logistical relationship, with a view tomaking optimal use of the rest capacity resulting from the possessions.f. In those cases that specifications cannot be processed within the set preconditions, <strong>ProRail</strong> willinitiate coordination with the parties involved.g. Point of departure is that the requirement for detour capacity entered in the timetable will, usingthe timetable process rules, be coordinated in the free capacity (after timetable allocation formanagement and traffic) of detour routes.h. If no consensus is achieved, <strong>ProRail</strong> and the titleholders involved will enter into a yet to be agreedprocedure to determine the allocation within 10 days.i. <strong>ProRail</strong> will in case of a dispute regarding capacity for work required by <strong>ProRail</strong> provide adequatesubstantiation of the usefulness and necessity of the required capacity.j. Once <strong>ProRail</strong> has determined the allocation (6-9 weeks before implementation) it can beprocessed in the planning systems.Capacity for work 58a. <strong>ProRail</strong> can acquire capacity for unscheduled maintenance during the annual timetable. Thisconcerns maintenance that is reasonably non-plannable on the closing date of the timetableapplication period and that cannot in all reasonableness be delayed until the next annualtimetable. Any changes to capacity allocated to traffic takes place subject to the rules for ad hoctraffic applications, meaning that permission of the capacity holder is required.b. Work, the performance of which is foreseen during the annual timetable, but which is not yetplannable on the closing date of the timetable application period, will be agreed in mutualconsultation at least 26 weeks before implementation. The processing of these applications isconcluded by recording the possession in the Donna planning system. For process controlreasons, no further changes can be made within 3 weeks before implementation.c. Following the timetable allocation, the titleholders and <strong>ProRail</strong> can request a change to thescheduling of work on grounds of unforeseen circumstances (in relation to the year plan) andunforeseen work. Point of departure is that the parties involved will cooperate in rescheduling;cooperation can only be denied on grounds of own operational interests.d. When formalising the manner and date of implementation it is possible that the furtherspecification does not fit in the capacity allocated in the annual timetable. Also, situations couldoccur in the project preparation and implementation which were not provided for when determining58The detailed steps are described in the ‘capacity allocation Management – Traffic’ procedure, available forconsultation on the website of <strong>ProRail</strong> (www.prorail.nl > vervoerders > capaciteit treinpaden > procedureverdeling).<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 54

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!