13.07.2015 Views

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

List of planning dates function changes Infrastructure projects to end 2019DescriptionRealisationapprovalPlanneddateReviseddateCommissioningfeasibilityHoorn, realise low service paths Yes III 2013 Dec 2013 UncertainTilburg, platform interval track 1 Yes III 2013 Jun 2013 CertainTilburg, raise arrival speed from Boxtel 2012 p.m.Tilburg; change track layout Loven railway yard Yes III 2013 Jun 2013 CertainTilburg; real connection Loven Yes III 2013 Jun 2013 CertainTotal High Frequency Rail Transport Programme 2012 p.m.(PHS)Zutphen, redevelopment of square Yes III 2015 ProbableWijchen, realise reversing track 2012 IV <strong>2014</strong> UncertainKAN: Elst; access connection Elst - Tiel 2012 2016 UncertainKAN: Elst; provide Aamsestraat underpass with 2012 2016 Uncertainaccess to platformsVenlo, reversing and cleaning track 2012 p.m.The Hague CS, realise track for HSE 2012 2016 ProbableBreda, realise reversing facility on track 852 2012 Dec 2012 CertainZwolle Coevorden and Deventer-Hengelo, frequency Yes Dec 2012 CertainincreaseZwolle-Groningen and Eindhoven-Sittard,2012 Dec 2013 Probablefrequency increaseSafety measures for frequency increaseMarkelo-Oldenzaal2012 Dec 2013 ProbableRandstad LineWoerden Molenvliet reversing facility Yes Dec 2012 CertainRegionetHoofddorp: extra simultaneousness from stabling Yes Dec 2012 Certainyard to tunnel tracksBeverwijk, reversing track from Haarlem direction to Yes IV <strong>2014</strong> IV 2015 Uncertain750 m and an extra stabling lineWormerveer increase overtaking speed Yes July 2013 CertainHalfweg/Zwanenburg new stop Yes Dec 2012 CertainAlmere Poort new stop Yes Dec 2012 CertainAmsterdam Transformatorweg flyover 2012 p.m.Regional linesArnhem-Winterswijk, track-doubling and fast points at 2012 2016 <strong>2014</strong> UncertainWehlEmmen Zuid; track-doubling 2012 2016 IV 2015 ProbableGroningen-Nieuweschans, speed increase from 2012 p.m.100 km/h to 120/140 km/hGroningen-Roodeschool, speed increase from 2012 p.m.70/80 km/h to 100 km/hHeerlen-Herzogenrath; track-doubling Heerlen- 2012 2019 UncertainLandgraafLeeuwarden-Harlingenhaven, speed increase 2012 IV <strong>2014</strong> Uncertainthrough signals modification in Dronrijp and FranekerTram Vlaanderen-Maastricht 2012 2016 UncertainHeerlen-Herzogenrath, overtaking track in Landgraaf 2012 p.m.Rijn Gouwe Line: partial double track and opening Yes p.m.new stopsCoevorden, realise holding track 2012 IV 2015 UncertainAlmelo, bay platform 2012 IV <strong>2014</strong> Uncertainappendix 10 Infrastructure projects and studies - Section a: Infrastructure projects<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 137

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!