Measure Status Ready for operationCongestion statement 2011/03, stabling capacity Hoofddorp railway yardBottleneck: The requested stabling capacity exceeds the available stabling capacity.The capacity-enhancement plan proposes the measures below.Extension of track 211 for the realisationof 14 wagon units in stabling and servicecapacity.Commissioning of a carrousel processbetween Hoofddorp stabling yard andHoofddorp station in order to realise astructural reduction in the need forcapacity of 8 to 12 wagon units.Realisation of 'Hoofddorp stabling yard,expansion stabling capacity' projectStarted 2nd quarter 2015Started 2017Congestion statement 2011/04, railway yard Amsterdam WesthavenBottleneck: The stabling capacity of Amsterdam Westhaven and the connected infrastructural yard is insufficientto facilitate the processes of the various transport operators.The capacity-enhancement plan proposes the measures below.Improve the processes and control on Started Mid 2013the basis of current information (and do itfaster than the time time formallyprescribed for a capacity-enhancementplan) + camera supervisionReroute trains that need not visit Implemented after completion of 4th quarter 2012WesthavenAziëhaven electrificationIntegral approach to the logistics chain Implemented 3th quarter 2012Stable loaded rubble trains elsewhere Implemented after capacity reallocationat Amersfoort GE2th quarter 2012Congestion statement 2012/01, convergence route section Amersfoort - BarneveldBottleneck: To facilitate transfer, Connexxion has requested scheduling in complete symmetry with the -.15 and-.4 times, including a short turn in Ede-Wageningen. The requested capacity cannot be offered on the existinginfrastructure in combination with the other requested train series on the convergence route section.The capacity-enhancement plan concludes that the expected benefits from the changed scheduling do notweigh up against the costs required to make the infrastructure suitable for the requested scheduling. Thecapacity-enhancement plan therefore does not prescribe any measures to increase capacity.No measures follow from the capacityenhancementplan.- -Congestion statement 2012/02, station ZevenaarBottleneck: NS HiSpeed and Syntus want to make use of the same time slots on track 3 in Zevenaar.Capacity analysis shows that the current Robust Track Top 50 project at Zevenaar-Didam already includesconsultation with the transport operators aimed at finding a solution for the conflict that has led to the congestionstatement. It has therefore been decided not to draw up a separate capacity analysis and capacity-enhancementplan. The capacity-enhancement plan therefore does not prescribe any measures to increase capacity.A solution is being developed in thecurrent Robust Track Top 50 project atZevenaar-DidamUncertain, yet to be determined on thebasis of questions from a supplementarycapacity analysis.Not yet knownappendix 10 Infrastructure projects and studies - Section c: implementation of capacity-enhancement plans<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 141

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!