13.07.2015 Views

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Where is the serviceprovidedApplicationEU category 68Tariffhandling via the ISVL application (see Section 5 of appendix 23).g. The provision of information to the railway undertaking about train servicehandling via the VIEW application (see Section 1 of appendix 24).h. The provision of information, in the form of a standard data file, on the factualrealisation of the train service via, e.g., the Realisation/Facts service (seeSection 2 of appendix 24) and the Monitoring report (see Section 3 of appendix24).i. The possibility of accepting or rejecting causes of train deviation assigned torailway undertakings via the Approval Monitoring application (see Section 4 ofappendix 24).j. The services of <strong>ProRail</strong>’s emergency organisation pertaining to alarm signals,the evacuation and clearing of the tracks after accidents and irregularities, aswell as the re-railing of railway vehicles and moving damaged railway vehiclesto a safe place where they will not hinder traffic. This also includes the integralcoordination of the operations of railway undertakings in these circumstances,as well as coordination with the competent authorities and their emergencyservices (deployment costs at the expense of the causing party). The costs ofretaining the emergency organisation are included in the tariff per trainkilometre. The deployment costs are charged to the causing party.This service is provided on main railwaysVia capacity allocation processCategory 1 (minimum access package)The tariff depends on the weight category of the train and is charged per trainkilometre:Weight categoryTariffDelivery timeDelivery termsUser conditionsup to 160 tons € 0.7592between 161 and 320 tons € 1.0797between 321 and 600 tons € 1.5086between 601 and 1,600 € 2.4158tonsbetween 1,601 and 3,000 € 2.9088tonsfrom 3,001 tons € 3.1553The HSL levy (see Chapter6.2) is € xx.xx 69 per train kilometre.The deployment costs of the response organisation: actual deployment costs, perincident.According to the order times of the capacity allocation process.Titleholders who do not qualify as railway undertaking can exclusively acquire from<strong>ProRail</strong> the items a and b of this service, as described above.Also applicable are the delivery terms stated in the tables and appendices asreferred to in the description of the service.The Operational Conditions (see appendix 6) are applicable.The service is limited to use by normal traffic, not being Exceptional Transport (seeSection 1.2 of appendix 6).With a view to optimising the use of the capacity of the main railways, the partiesmay agree on the application of the Quiet Train Kilometres performance scheme(see appendix 27).Also applicable are the user conditions stated in the tables and appendices asreferred to in the description of the service.6869In accordance with Annex II of Directive 2001/14/ECProvisional tariff is set after determination of the capacity allocation for the <strong>2014</strong> Timetable<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 65

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!