- Page 1 and 2: Network Statement 2014Combined Netw
- Page 3 and 4: Contents1 General information 51.1
- Page 5 and 6: 1 General information1.1 Introducti
- Page 7 and 8: with due consideration for their op
- Page 9 and 10: • The tariffs have been updated o
- Page 11 and 12: Charging InformationSystem (CIS)CIS
- Page 13 and 14: 2 Access conditions2.1 Introduction
- Page 15 and 16: infrastructure. A Framework Agreeme
- Page 17 and 18: 2.6 Dangerous goodsThe transport of
- Page 19 and 20: 3 Infrastructure3.1 IntroductionThi
- Page 21 and 22: 3.2.3 Further informationThe Networ
- Page 23 and 24: CategoryAvailability / ReliabilityN
- Page 25 and 26: Exceptional Transport, subject to t
- Page 27 and 28: Table 3.4CategoryDescription of the
- Page 29 and 30: • Radiotelephone channels used fo
- Page 31 and 32: (parties who are co-responsible for
- Page 33 and 34: Maasvlakte; Valburg CUPThe above su
- Page 35 and 36: attached to the transport or handli
- Page 37: 3.7 Freight terminalsThe loading an
- Page 41 and 42: CategoryNotesUser conditions • Th
- Page 43 and 44: 4 Capacity allocation4.1 Introducti
- Page 45 and 46: 4.2.2 Process in generalFour types
- Page 47 and 48: these tests could have implications
- Page 49 and 50: • or in another form to be agreed
- Page 51 and 52: - Short stabling takes precedence o
- Page 53 and 54: 4.4.1.3.3 Determination of allocati
- Page 55 and 56: the required capacity. ProRail will
- Page 57 and 58: Process System Brief explanationAnn
- Page 59 and 60: allocation plan. Trains that are un
- Page 61 and 62: 4.9 Allocation of capacity for serv
- Page 63 and 64: 5 Services5.1 IntroductionProRail o
- Page 65 and 66: Where is the serviceprovidedApplica
- Page 67 and 68: 5.3 Transfer service groupThe servi
- Page 69 and 70: Delivery termsUser conditionsA rese
- Page 71 and 72: TariffDelivery termsUser conditions
- Page 73 and 74: Availability / Reliability7 x 24 ho
- Page 75 and 76: 5.5.8 Information on customised tra
- Page 77 and 78: that determines the amount of elect
- Page 79 and 80: 6 Charges6.1 IntroductionThis chapt
- Page 81 and 82: - The affected infrastructure is th
- Page 83 and 84: The applicable train stop code is d
- Page 86 and 87: Supplementary to the railway stated
- Page 88 and 89:
TermCapacity AgreementCentrally con
- Page 90 and 91:
TermRailway yardRefuelling systemRN
- Page 92 and 93:
TermTrain slotDefinitionA train slo
- Page 94 and 95:
(empty page)appendix 2 DefinitionsN
- Page 96 and 97:
(empty page)appendix 3 Consultation
- Page 98 and 99:
(empty page)appendix 4 General Regu
- Page 100 and 101:
(empty page)appendix 5 Model Access
- Page 102 and 103:
undertaking by making use of the de
- Page 104 and 105:
2. Capacity allocated in the form o
- Page 106 and 107:
party causing the disruption. The p
- Page 108 and 109:
. In case of personal injury and fi
- Page 110 and 111:
5. This article is a third-party cl
- Page 112 and 113:
2. The network manager can terminat
- Page 114 and 115:
network manager in connection with
- Page 116 and 117:
Order handling from 36 hours to 1 h
- Page 118 and 119:
As soon as a driver has completed a
- Page 120 and 121:
d. Refuelling at a railway yard sub
- Page 122 and 123:
No. SubaspectResponsibility8 Altern
- Page 124 and 125:
appendix 7 Transport and operating
- Page 126 and 127:
(empty page)appendix 7 Transport an
- Page 128 and 129:
ProRail will provide a railway unde
- Page 130 and 131:
(empty page)appendix 8 ReportsNetwo
- Page 132 and 133:
Passenger transport restrictionsThe
- Page 134 and 135:
a. Infrastructure projectsList of p
- Page 136 and 137:
List of planning dates function cha
- Page 138 and 139:
List of planning dates function cha
- Page 140 and 141:
c. Implementation of capacity-enhan
- Page 142 and 143:
Measure Status Ready for operationC
- Page 144 and 145:
appendix 10 Infrastructure projects
- Page 146 and 147:
(empty page)appendix 11 Information
- Page 148 and 149:
NotesSpecial loading gaugesThe spec
- Page 150 and 151:
(empty page)appendix 13 Axle loads
- Page 152 and 153:
(empty page)appendix 14 Train contr
- Page 154 and 155:
(empty page)appendix 15 Train detec
- Page 156 and 157:
(empty page)appendix 16 Route secti
- Page 158 and 159:
Voltage change-over gates Betuwe Ro
- Page 160 and 161:
List of moveable railroad bridgesNo
- Page 162 and 163:
(empty page)appendix 18 Moveable ra
- Page 164 and 165:
(empty page)appendix 19 Platform le
- Page 166 and 167:
(empty page)appendix 20 Public load
- Page 168 and 169:
Information on the storage capacity
- Page 170 and 171:
2.2 Interval and intersection times
- Page 172 and 173:
Table 3Intersection time in the opp
- Page 174 and 175:
Examplesappendix 22 Timetable draft
- Page 176 and 177:
appendix 22 Timetable drafting norm
- Page 178 and 179:
appendix 22 Timetable drafting norm
- Page 180 and 181:
(empty page)appendix 22 Timetable d
- Page 182 and 183:
2 Description of the Path Coordinat
- Page 184 and 185:
CategoryDelivery termsUser conditio
- Page 186 and 187:
2 Description of the report on insi
- Page 188 and 189:
(empty page)appendix 24 Application
- Page 190 and 191:
(empty page)appendix 25 Services co
- Page 192 and 193:
Name of the stationStation category
- Page 194 and 195:
Name of the stationStation category
- Page 196 and 197:
(empty page)appendix 26 Stations (
- Page 198 and 199:
(empty page)appendix 27 Performance
- Page 200:
Route sectionCompensationtariffBreu