13.07.2015 Views

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

Network Statement 2014 - ProRail

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

appendix 23 Applications for capacity allocation (§ 4.4.5)This Appendix describes the following applications that are used in (the preparation of) the capacityallocation process:1. Donna2. Path Coordination System (PCS)3. EMMA4. RADAR5. ISVL1 Description of the Donna applicationCategoryNotesApplicationFunctionDonnaThis application concerns the planning, requesting and allocation of all forms ofinfrastructure use (excluding stationary use) at both network and node level.Donna is made available to all titleholders. In Donna, railway undertakings canmake their own planning and request capacity, but can also opt to assign thesetasks to a third party.The capacity allocation procedure can be monitored and Donna gives insight intothe occupied or available infrastructure capacity up to the time that the planningcloses, which is 2 to 4 days before the traffic day.Also available is a standard interface with which all users of the infrastructure canestablish connections with their systems for personnel, vehicle deployment ormanagement information.FacilityAccount and a Citrix account, per user) providing access to the application, anduse of the functionalities granted within the scope of the authorisation.Application Via the website of <strong>ProRail</strong> (www.prorail.nl > vervoerders > diensten > informatie >Donna)Delivery timeA maximum processing time of 5 working days is set between the request for andgranting of access to the application.Delivery termsHardware modifications: for the user's account (e.g., installation of software forCitrix, Adobe Acrobat Reader, make own systems suitable for standard interfaceand/or increase harddisk capacity). Minimum hardware requirements: available onrequest from <strong>ProRail</strong> Functional Management (functioneel.beheer@prorail.nl).The service is also made available within the context of the capacity allocationprocess.Use of Donna is subject to the procedures laid down by <strong>ProRail</strong>.User conditions The application is accessible from every PC with a browser and an Internetconnection.Availability / Reliability Availability of application: 7x24 hours (subject to fixed maintenance periods, whichare yet to be determined).Availability of support services: during working days from 07:00 – 17:00 hours.appendix 23 Applications for capacity allocation (§ 4.4.5)<strong>Network</strong> <strong>Statement</strong> <strong>2014</strong> Combined <strong>Network</strong> - version 1.0 dated 9 January 2013 page 181

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!