13.07.2015 Views

P12x/EN T/Eb6 - Schneider - error

P12x/EN T/Eb6 - Schneider - error

P12x/EN T/Eb6 - Schneider - error

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Commissioning and Maintenance<strong>P12x</strong>/<strong>EN</strong> CM/<strong>Eb6</strong>MiCOM P120/P121/P122/P123 Page 9/184. SETTING CHECKThe setting checks ensure that all of the application-specific relay setting for the particularinstallation have been correctly applied to the relay.Transfer the setting file to the relay using a laptop PC running the appropriate software viathe RS232 front port (all MiCOM <strong>P12x</strong> models) or the RS485 rear port (all MiCOM models).This method is preferred transfer function settings because it is much faster and there is lessmargin for <strong>error</strong>.4.1 SettingsIf the setting software is not used then enter manually via the relay front panel interface.The commissioning is following the points below:• Consignation of the settings• Validation of the measurements• Validation of the thresholds and associated timers.Carry forward the settings on the commissioning test sheets.4.2 MeasurementsThe MiCOM P120, P121, P122 and P123 relays measure phase and earth currents (P120only one phase or earth) as a True RMS value up to the 10 th harmonics. The value(s)indicated take account of the phase and/or earth CT ratio.WARNING:MiCOM P120, P121, P122 AND P123 RELAYS HAVE 1 AND 5 AMPCURR<strong>EN</strong>T INPUTS.CHECK THAT THE INJECTED CURR<strong>EN</strong>T IS COMPATIBLE WITH THESELECTED RANGE.4.2.1 MiCOM P120−−−−Note the select CT ratio.Energise the MiCOM P120 relay.Apply current to input terminals 55-56 or 47-48 and verify the value on the LCDdisplay.Carry forward the results to the Commissioning test sheets (Applied value and relayvalue displayed)4.2.2 MiCOM P121, P122 and P123−−−−Note the select phase and earth CTs ratio.Energise the MiCOM P121, P122 or P123 relay.Apply current to input (as per wiring diagram) and verify the values on the LCDdisplay.Carry forward the results to the Commissioning test sheets (Applied values and relayvalues displayed).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!