13.07.2015 Views

P12x/EN T/Eb6 - Schneider - error

P12x/EN T/Eb6 - Schneider - error

P12x/EN T/Eb6 - Schneider - error

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Commissioning and Maintenance<strong>P12x</strong>/<strong>EN</strong> CM/<strong>Eb6</strong>MiCOM P120/P121/P122/P123 Page 11/18AUTOMAT. CTRL/Trip commands MenuTRIP tI e >TRIP tI e >>YESYES4.3.2.2 MiCOM P121, P122 and P123 settingsProtection MenuI> YESI> 1 IntI>DMT or IDMT or RItI> (if DMT)20 sType of curve (if IDMT)IEC VI or IEEE VITMS value (if IDMT) 1K value (if RI) 1I>>YESI>>12 InAUTOMAT. CTRL/Trip commands MenuTRIP tI>TRIP tI>>YESYES4.3.3 I> threshold with DMT tI>Values to be recorded:I> threshold for each phaseTime delay tI> for each phase.I> threshold check:If the time delay tI> is short, gradually increase the injection current up to the value of the I>threshold.If the time delay tI> is long, inject 0.95 x I threshold and check that there is no tripping. Theninject 1,1 x I threshold and check the trip.Gradually decreases the injected current and record the value of the drop out I> threshold.Checks:Alarm message on the LCD display.Alarm LED flashes.Trip LED onI> threshold LED on (if programmed).Trip output closes.I> threshold output closes (if programmed).tI> time delay check:Apply a current onto one of the phases and measure the time delay tI> by pre-setting thecurrent above the I> threshold (I injected > 2 x I threshold).Apply a current onto one of the phases and measure the time delay tI> by pre-setting thecurrent above the I> threshold (I injected > 10 x I threshold).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!