AFI 11-2C-130v3 - BITS
AFI 11-2C-130v3 - BITS
AFI 11-2C-130v3 - BITS
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>AFI</strong><strong>11</strong>-<strong>2C</strong>-130V3 23 APRIL 2012 47<br />
Propeller 4 4 4 Propeller may be operated with a feather<br />
override failure where the override button<br />
fails to pop out at full feather (faulty<br />
pressure switch), provided maintenance<br />
instructions in the applicable fault isolation<br />
manual are followed and no other system is<br />
affected.<br />
Synchrophaser 1 1 0* *Shall be repaired at next repair capable<br />
facility, provided no other portion of the<br />
propeller system is affected. Synchophaser<br />
will be removed.<br />
Table 4.3. Electrical System.<br />
Item/System Installed Required<br />
A B Remarks/Limitations/Exceptions<br />
Generators, Engine-Driven<br />
4 4 3* *Shall be repaired at next repair capable<br />
facility. If the AC generator is not equipped with a<br />
generator disconnect, it will be removed and the<br />
generator mount padded before flight. Local training<br />
missions may continue after a generator is<br />
disconnected or removed and the mount padded,<br />
provided no other electrical malfunction exists.<br />
Bus Switching Unit (BSU) 2 2 1* *The #1 BSU must be operational.<br />
Transformer Rectifiers (TR) 4 4 3* *One Essential TR unit may be inoperative for onetime<br />
flight to a repair capable facility provided no other<br />
electrical malfunction exists.<br />
LH DC Transformer Rectifier 1 0* 0* *Theater specific SPINS dictate requirements.<br />
ATM and ATM<br />
generator/APU Generator<br />
1 1 0* *If the ATM, ATM generator/APU generator fails,<br />
flight in VMC is authorized provided no other electrical<br />
malfunctions exist. APU generator will be removed<br />
and padded before operation of the APU.<br />
Generator Out Lights 4 4 4* *If a generator has been disconnected or removed and<br />
padded, its associated indicators do not have to be<br />
operational. All associated equipment and indicators<br />
will be operational for each operative engine-driven<br />
generator (i.e., generator control panel, GCU, voltage<br />
regulator, generator out/caution light, AC loadmeter,<br />
etc.).<br />
AC Loadmeter 4 4 4* *If a generator has been disconnected or removed and<br />
padded, its associated indicators do not have to be<br />
operational. All associated equipment and indicators<br />
will be operational for each operative engine-driven<br />
generator (i.e., generator control panel, GCU, voltage<br />
regulator, generator out/caution light, AC loadmeter,<br />
etc.).<br />
Table 4.4. Anti-Ice/De-Ice System.<br />
Item/System Installed Required<br />
A B Remarks/Limitations/Exceptions