02.06.2013 Views

NAVFAC P-300 Management of Transportation Equipment

NAVFAC P-300 Management of Transportation Equipment

NAVFAC P-300 Management of Transportation Equipment

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

STEP 1<br />

<strong>Equipment</strong> Repair Order Flow<br />

EQUIPMENT REPAIR ORDER and<br />

SINGLE LINE-ITEM CONSUMPTION DOCUMENT<br />

NAVSUP Form 1250-10 Internal Flow and Distribution<br />

PREVENTIVE MAINTENANCE CLERK. Initiates ERO completing blocks 1, 2,<br />

3, 4, 5, 6, 27, 28, 44, 48, 49, 50, 51, 53, 55, 56, 61, and enters next ERO number<br />

from ERO log in ERO number block. Enter all information from ERO in log,.<br />

Attach hard card to ERO and pass to Direct Turnover/Cost Control Clerk.<br />

NOTE: Ensure all EROs for field crew are coded 06, in block 6, for all repairs<br />

made in the field.<br />

STEP 2<br />

DIRECT TURNOVER/COST CONTROL CLERK. Will research DTO Log and<br />

Summary Sheet. Fill out DTO Information Sheet (see figure 3-10) and attach it<br />

to ERO. Research history jackets for work deferred and enters on the DTO<br />

Information Sheet. If complete 1250-1s are attached from Collateral, enter work<br />

description in block 63 and “On Order” in block 66. Have Maintenance<br />

Supervisor sign 1250-1s into Repair Parts Custodian. Pass ERO to the Initial<br />

Inspector.<br />

STEP 3<br />

INITIAL INSPECTOR. Will thoroughly inspect equipment using Inspection<br />

Guide, paragraphs 3203 and 3204. Enter all previous work deferred <strong>of</strong>f to DTO<br />

Information Sheet in block 63 <strong>of</strong> ERO. Complete blocks 7, 8, 14, 29, 30, 45, 63,<br />

72, and 73, and blocks 54 and 82 when applicable. Pass ERO to Maintenance<br />

Supervisor for signature.<br />

NOTE: When utilizing SAMMS EM, pass ERO package to Preventive<br />

Maintenance Clerk for completed entry and print.<br />

STEP 4<br />

MAINTENANCE SUPERVISOR. Will ensure that ERO and package is properly<br />

completed and that work description is clear and concise. If everything is OK,<br />

and work described is authorized to be started, sign block 80 and date block 81.<br />

Pass ERO and completed package to the appropriate shop.<br />

Figure H-28<br />

H-47

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!