NOTE (1): Ensure an 06 ERO is made out for all Intern repairs made by field<br />

crew that exceed one hour.<br />

NOTE (2): All PMs performed by field crew will remain 01 or 02.<br />

STEP 5<br />

SERVICE OR REPAIR SHOP SUPERVISOR. Will review work descriptions and<br />

schedule equipment into shop. If OK, sign block 68. When work can be<br />

assigned to a mechanic, complete blocks 46 and 47, remove green copy <strong>of</strong> ERO<br />

and worksheet and return them to protective folder. Shop Supervisor will retain<br />

as remaining copies <strong>of</strong> ERO. Issues DTO parts at this time. Before signing<br />

NAVSUP Form 1250-1s for repair parts, Shop Supervisor will ensure that<br />

equipment cannot be repaired without those parts. Only the Shop Supervisor or<br />

his assistant sign NAVSUP Form 1250-1s.<br />

STEP 6<br />

MECHANIC. If additional parts are required to accomplish repairs, he will notify<br />

the Shop Supervisor <strong>of</strong> the parts needed. (Shop Supervisor will then task the<br />

Technical Libraries to research the parts and fill out a NAVSUP Form 12501 or<br />

2. Obtain Shop Supervisor’s signature on the NAVSUP Form 12501 or 2 and<br />

issue repair parts to the mechanic. Obtain receipt signature <strong>of</strong> mechanic).<br />

Mechanic will complete all possible work listed in block 63 and enter hours and<br />

or tenths <strong>of</strong> hours expended on the item <strong>of</strong> repair in block 65. He will initials and<br />

enter his rate for each repair made in block 67. When all possible work has<br />

been completed and all appropriate blocks on the ERO have been filled in, pass<br />

complete package containing green copy <strong>of</strong> ERO and worksheet back to Shop<br />

Supervisor. At this time the mechanic with clean hands, will initial and enter his<br />

rate on the white copy <strong>of</strong> the ERO for work performed.<br />

STEP 7<br />

SHOP SUPERVISOR. Upon receipt <strong>of</strong> mechanic’s ERO, worksheet and initials<br />

on white ERO copy, the Shop Supervisor will inspect equipment to ensure that<br />

all repair parts bought, manufactured or use from other equipment has been<br />

entered on worksheet. (All work to be deferred will be initialed by the<br />

Maintenance Supervisor). If unit is to be deadlined, ensure blocks 40 and 41<br />

are completed. Then recount all parts numbers, prices and quantities for repair<br />

parts and petroleum used, on ERO worksheet. Forward completed paperwork<br />

package to Final Inspector and unit to the final inspection line.<br />

Figure H-28 (cont)<br />

H-48

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!