2.8.2 <strong>Transportation</strong> <strong>Equipment</strong> P-1 Lines. The broad vehicle/equipment categories<br />

below comprise the budget grouping P-1 lines in the transportation equipment program<br />

funded as CESE. (See Figure 2-2 for P-1 Line Summary)<br />

XA Passenger Carrying Vehicles<br />

XB Special Purpose Vehicles/<strong>Equipment</strong><br />

XC General Purpose Trucks<br />

XH Construction & Maintenance <strong>Equipment</strong><br />

XJ Fire Fighting<br />

XG Tactical <strong>Equipment</strong><br />

31 Railway <strong>Equipment</strong><br />

NOTE: P-1 line 31 is not normally funded but carries a P-1 line number for<br />

administrative purposes.<br />

2.8.3 OPN Requirements Procedures. To coincide with the DoD budget submission,<br />

a requirements review will be conducted on a biennial basis for CESE funded in the<br />

Other Procurement, Navy CESE Budget Activity 5. These procedures are applicable to<br />

non-DBOF activities and for passenger carrying equipment only for DBOF activities.<br />

Requirements established during the review will, within approved funding levels, be<br />

procured from the two budget year funds. The first budget year is the fiscal year two<br />

years following the submission year, e.g., the first budget year for submission in FY 96 is<br />

FY 98. Funding constraints preclude the replacement <strong>of</strong> all equipment items that exceed<br />

life expectancy and require activities to execute an effective operation and maintenance<br />

program to extend the useful life <strong>of</strong> equipment to the maximum. To make the best use <strong>of</strong><br />

the limited funding, the requirements identification process must emphasize selection <strong>of</strong><br />

the highest priority equipment items. A projected funding level will be developed for<br />

each activity to be used for conducting the requirements review. Use <strong>of</strong> a projected<br />

funding amount eliminates the need to prioritize all eligible items and instead emphasis<br />

can be placed on selecting the highest priority requirements. Each activity will develop a<br />

requirements listing that can be funded within the projected funding amount. The<br />

TEMCs will forward a requirements package and any amplifying instructions to activities<br />

under their cognizance each review year. The following data will be provided to each<br />

activity or be available through direct access to CASEMIS:<br />

• CESE inventory records.<br />

• Current authorized CESE IOs.<br />

• Procurement status information for equipment that is funded and under<br />

procurement but not delivered.<br />

• Procurement information for equipment that is planned for procurement but<br />

for which funding has not been approved.<br />

2-19