2.13.8 Assistance with CESE Deficiencies. Activities unable to resolve warranty or<br />

contract deficiencies shall so indicate on the QDR report. CESO 15L2 shall initiate<br />

further action to resolve the deficiencies by communicating with the contractor and the<br />

contracting <strong>of</strong>ficer. CESO 15L2 will advise the QDR originator <strong>of</strong> progress in this regard.<br />

Unless otherwise directed, activities shall not communicate directly with the contracting<br />

<strong>of</strong>ficer. In order for CESO 15L2 to provide assistance in resolving QDR deficiencies, the<br />

QDR originator must fill out the QDR report completely per paragraph 2.13.9. The<br />

originator must be clearly identified on the QDR report with an accurate phone number<br />

and address. The TEMCs shall assist with coordinating communication between CESO<br />

15L2 and activities when requested either by an activity or CESO 15L2. This<br />

coordination can be particularly important in dealing with CESE deficiencies at activities<br />

overseas.<br />

2.13.9 Preparation and Distribution <strong>of</strong> Quality Deficiency Report (QDR),<br />

Standard Form 368. Activities shall complete QDR reports as indicated in the sample in<br />

Appendix H, Figure H-11. If a QDR form is not available, Appendix H, Figure H-10 may<br />

be photocopied or the requested information may be stated in any type <strong>of</strong> written<br />

correspondence. Completeness and accuracy are essential for processing the QDR in a<br />

timely manner and for providing all necessary action.<br />

a. Completeness. Section 1 <strong>of</strong> the QDR is to be completed by the activity.<br />

The activity shall provide information for blocks: 1a, 1b, 2a, 3, 4, 6, 7, 8, 10, 11, 12, 13,<br />

15, 15b, 15c, 16a (1) and (2), 16b (2) and (3), 17, 18, 19, 20, 21 (as applicable), and 22.<br />

Additional sheets may be added to the QDR report when there is insufficient space in the<br />

blocks provided. For trucks, include chassis manufacturer and chassis identification<br />

number as well as the body manufacturer and body identification number. Include USN<br />

registration number(s) in blocks 16a (1) and (2).<br />

b. Distribution. The originating activity shall date and assign a serial number<br />

to each QDR report and distribute the QDR as follows.<br />

(1) Original to:<br />

CO NCBC, CESO 15L2 FAX: CESO 15L2<br />

1000 23rd Avenue (805) 982-3395<br />

Port Hueneme, CA 93043-4301 DSN 551-3395<br />

If you facsimile a copy, also mail the original.<br />

(2) Copy to the cognizant TEMC.<br />

c. Final Resolution. CESO and the TEMCs will coordinate action until the QDR<br />

is resolved. CESO Code 15L2 will provide notification <strong>of</strong> the final resolution <strong>of</strong> major<br />

deficiencies to both TEMCs, <strong>NAVFAC</strong>, and to the affected activities.<br />

2.13.10 Additional QDR Guidance. It is important that the QDR state what corrective<br />

action has been taken and the status <strong>of</strong> this action. The status shall indicate names <strong>of</strong><br />

dealers, factory branch <strong>of</strong>fices or manufacturers contacted, and action resulting from<br />