16 Commissioning and Start-up Procedure<br />

This section describes the commissioning procedure for the controls step-by-step. The precise<br />

descriptions of the functions may be found by referring to the appropriate sections.<br />

16.1 Code numbers for commissioning<br />

Certain operating conditions and functions for the commissioning procedure must be selected by<br />

code numbers (see Section "Display and operation").<br />

Code number Function<br />

9 51 48 List of machine parameters (see Chapter "Machine parameters")<br />

80 76 67 PLC operation (see Chapter "PLC programming")<br />

53 12 10 Cancel markers M1000 to M2000 and B0 to B127<br />

7 53 68 Automatic offset adjustment (see Section "Servo positioning")<br />

10 52 96 Non-linear axis error compensation (see Section 1.6.4)<br />

16.2 Preparation of the machine<br />

The machine is prepared without a control being connected.<br />

Follow the sequence below to commission the drive amplifiers:<br />

– Clamp the nominal value lead to 0 V:<br />

Disconnect and short together the nominal value inputs of the drive amplifiers.<br />

0 V must be applied to the input.<br />

– Connect the servo-enable input:<br />

Connect the servo-enable input to 24 V, thus activating the servo.<br />

– Connect the power supply to the drive amplifiers.<br />

– Rough offset adjustment:<br />

If the axis moves even though the nominal value input is clamped to 0 V, the offset<br />

potentiometer must be adjusted such that the axis comes to a stop. After the offset adjustment,<br />

remove the short-circuit bridge on the nominal value input.<br />

– Rough velocity adjustment:<br />

Connect battery supply to the nominal value input. Adjust the battery supply to 9 V and adjust<br />

the drive motor with the tacho-potentiometer to the desired speed (which equals the maximum<br />

rapid traverse rate). The rated speed can be read from the drive motor with a tachometer.<br />

8/95 <strong>TNC</strong> <strong>360</strong> 16 Commissioning and Start-up Procedure 4-227