22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Installation</strong> check list: Antenna<br />

Step Task Further information Done<br />

7. Check that the mounting<br />

height of the antenna is in<br />

accordance with the ship’s<br />

min. roll period.<br />

8. Make sure that the<br />

requirements for mast<br />

foundation and height,<br />

including flatness, gusset<br />

plates and distance from<br />

welding seams are met.<br />

9. Make sure that the distances to<br />

radar, Inmarsat systems, GPS<br />

receivers and other<br />

transmitters are as required.<br />

10. Make sure that the drain tube<br />

is open and risk for water<br />

intrusion is at a minimum.<br />

11. Check that the ADU is<br />

grounded correctly, using the<br />

mounting bolts.<br />

See Ship motion and offset<br />

from the ship’s motion<br />

centre on page 3-7.<br />

See ADU mast design:<br />

Foundation and height on<br />

page 3-8.<br />

See Interference on page 3-<br />

13.<br />

See Other precautions on<br />

page 3-17.<br />

See Grounding the ADU on<br />

page 3-23<br />

and<br />

Grounding and RF<br />

protection on page F-1.<br />

Table 7-1: <strong>Installation</strong> check list: Antenna (Continued)<br />

7-2 Chapter 7: <strong>Installation</strong> check 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!