22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Installation</strong> check list: ACU, connectors and wiring<br />

Step<br />

Task<br />

Verification and further<br />

information<br />

Done<br />

8. Check connection of the VSAT modem:<br />

COMTECH only!: Check that the ACU RS-<br />

232 port is connected to the Remote<br />

Control port and Alarm port of the VMU<br />

using the serial cable (specifications in<br />

Modem Cable Comtech Serial & RSSI<br />

TT7016A on page B-2).<br />

iDirect iNFINITI Series/ Evolution only!:<br />

Check that the ACU RS-232 port is<br />

connected to the Console port of the VMU<br />

using the included serial cable.<br />

iDirect iNFINITY Series only!: Check that<br />

the ACU LAN port 1 is connected to the<br />

LAN B of the VMU using the included<br />

CAT5 Ethernet cable.<br />

iDirect Evolution only!: Check that the<br />

ACU LAN port 1 is connected to the LAN of<br />

the VMU using the included CAT5<br />

Ethernet cable.<br />

STM SatLink 2900: Check that the ACU<br />

LAN port 1 is connected to the LAN of the<br />

VMU using the included CAT5 Ethernet<br />

cable.<br />

Gilat SkyEdge II VSAT modem: Check that<br />

the ACU RS-232 port is connected to the<br />

SERIAL port of the VMU using the<br />

included serial cable.<br />

9. Check that the ADU's NMEA 0183<br />

connector is connected to the NMEA 0183<br />

bus of the vessel using the included<br />

multi-connector<br />

10. Measure that the power has the correct<br />

polarity in the power connector, before<br />

connecting it to the ACU power input.<br />

(Vin+: left, Vin-: right).<br />

Visual inspection of the<br />

connector panel of the<br />

ACU and the VSAT<br />

modem. See also:<br />

Connecting a Satlink2900<br />

VSAT modem on page 4-11<br />

Connecting an iNFINITI®<br />

Series Satellite Router on<br />

page 4-9<br />

Connecting an<br />

Evolution® Satellite<br />

Router on page 4-10<br />

Connecting a Satlink2900<br />

VSAT modem on page 4-11<br />

Connecting a Gilat<br />

SkyEdge II VSAT modem<br />

on page 4-12<br />

Visual inspection of the<br />

connector panel of the<br />

ACU connector.<br />

Use a volt meter. See<br />

Table 4-1: DC Input plug,<br />

outline and pin<br />

assignment on page 4-3.<br />

Table 7-2: <strong>Installation</strong> check list: ACU, connectors and wiring (Continued)<br />

7-4 Chapter 7: <strong>Installation</strong> check 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!