22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Removal and replacement of ADU modules<br />

Position 2<br />

Position 3<br />

Position 1<br />

Figure 9-63: Belt tension in 3 positions<br />

3. Now tighten the 4x4 mm Allen screws of the Cross Elevation<br />

Motor & Encoder assembly.<br />

Figure 9-64: Cross Elevation motor assembly, tighten screws<br />

4. Check the tension of the belt again (80-100 Hz). If needed, repeat<br />

the tension adjustment.<br />

9-52 Chapter 9: <strong>Service</strong> & maintenance 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!