22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7.2 <strong>Installation</strong> check list: ACU,<br />

connectors and wiring<br />

Step<br />

Task<br />

1. Check that the ACU is grounded correctly,<br />

using the mounting bolts and washers.<br />

<strong>Installation</strong> check list: ACU, connectors and wiring<br />

Verification and further<br />

information<br />

See Grounding the ACU<br />

(bulkhead) on page 3-27<br />

or Grounding the 19” rack<br />

version of the ACU on<br />

page 3-31<br />

Grounding and RF<br />

protection on page F-1.<br />

2. Make sure you strain relieved the cables. See <strong>Installation</strong> of the<br />

ACU (bulkhead) on<br />

page 3-26 or Installing<br />

the 19” rack version of the<br />

ACU on page 3-30.<br />

3. Make sure that the VSAT modem is<br />

mounted close to the ACU.<br />

4. Check that the ADU antenna N-connector<br />

is properly connected with the 50 Ohm RF<br />

cable.<br />

5. Check that the ACU antenna N-connector<br />

is properly connected with the 50 ohm RF<br />

cable.<br />

6. Check that the ACU's Rx Out is connected<br />

to the VSAT modem’s Rx in using the<br />

included 1 m F-F 75 ohm cable.<br />

and<br />

See General mounting<br />

considerations — VMU on<br />

page 3-32.<br />

Visual inspection of the<br />

cover plate at the bottom<br />

of the ADU.<br />

Visual inspection of the<br />

connector panel of the<br />

ACU.<br />

Visual inspection of the<br />

connector panel of the<br />

ACU and the VSAT<br />

modem.<br />

Done<br />

7777<br />

<strong>Installation</strong> check<br />

7. Check that the ACU's Tx In is connected to<br />

the VSAT modem's Tx out using the<br />

included 1 m F-F 75 ohm cable.<br />

Visual inspection of the<br />

connector panel of the<br />

ACU and the VSAT<br />

modem.<br />

Table 7-2: <strong>Installation</strong> check list: ACU, connectors and wiring<br />

98-133966-E2 Chapter 7: <strong>Installation</strong> check 7-3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!