22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3. Rotate the antenna pedestal so that the arm with the GPS module<br />

faces the service hatch.<br />

4. Rotate the Antenna Dish to top position.<br />

5. Press in and turn the elevation locking pin (only available from<br />

serial number TBD) to locked position.<br />

6. Rotate the Polarisation Unit so that the Polarisation Motor<br />

Module (PMM) can be reached.<br />

7. Disconnect the 6 connectors from the PMM.<br />

Removal and replacement of ADU modules<br />

9999<br />

Figure 9-29: Polarisation Motor Module, remove connectors<br />

8. Remove the 4x4 mm Allen screws.<br />

<strong>Service</strong> & maintenance<br />

98-133966-E2 Chapter 9: <strong>Service</strong> & maintenance 9-29

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!