22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Installation</strong> of the ADU<br />

4. Attach a webbed, four-part sling with a belt to all 4 lifting<br />

brackets.<br />

Figure 3-16: ADU installation, webbed sling attached to the 4 lifting<br />

brackets<br />

5. Attach 2 tag lines of suitable length to 2 lifting brackets and man<br />

them.<br />

6. With a crane lift the ADU off the wooden platform and move it on<br />

top of the ADU mast.<br />

7. Install the ADU on the mast flange with 4 M12 bolts and washers.<br />

Read carefully and follow instructions given in Grounding the<br />

ADU on page F-3.<br />

Tightening torque value: 30 Nm<br />

Figure 3-17: Mounting the ADU on the mast flange<br />

3-20 Chapter 3: <strong>Installation</strong> 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!