22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9.5.7.8 Inserting a new X Elevation Motor and Encoder<br />

To insert a new Cross Elevation Motor & Encoder follow the<br />

instructions above in reverse order — while observing the following<br />

mounting guidelines:<br />

1. Do not tighten the 4x4 mm Allen screws of the motor assembly.<br />

Figure 9-61: Cross Elevation motor assembly, do not tighten screws<br />

2. Adjust the belt tension using the belt tension/adjustment screw.<br />

Figure 9-62: X-Elevation Motor & Encoder — adjust belt tension<br />

The tension of the belt is 80—100 Hz on average, with the cross<br />

elevation beam in 3 positions.<br />

Removal and replacement of ADU modules<br />

9999<br />

<strong>Service</strong> & maintenance<br />

98-133966-E2 Chapter 9: <strong>Service</strong> & maintenance 9-51

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!