22.03.2015 Views

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

Training, Installation & Service Manual - Livewire Connections Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Power up<br />

5.4.0.1 Initialisation in daily use<br />

Once the system is configured and a satellite profile is active, the<br />

startup sequence is as follows:<br />

• ACU POST<br />

• ADU Initializing<br />

• ADU SW upload (If the software versions in the ADU and ACU<br />

are not the same, a software update is done during startup.)<br />

• ADU POST<br />

• READY<br />

• POINTING ANTENNA<br />

• ACQUIRING SIGNAL<br />

• TRACKING<br />

5.4.0.2 SAILOR 900 VSAT operational<br />

When the display shows TRACKING and the LED Logon is steady<br />

green, the system is operational.<br />

5-6 Chapter 5: Connecting power 98-133966-E2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!