26.08.2015 Views

OLD PARLIAMENT HOUSE AND CURTILAGE HERITAGE MANAGEMENT PLAN 2008–2013

Heritage Management Plan 2008-2013 - Museum of Australian ...

Heritage Management Plan 2008-2013 - Museum of Australian ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

7. Implementation and Review<br />

Part B – Management<br />

Old Parliament House and Curtilage Heritage Management Plan <strong>2008–2013</strong><br />

91<br />

Permitted Action Schedules<br />

The Permitted Action Schedules provide detailed<br />

guidelines on how permitted actions are to be<br />

undertaken. Permitted actions are those actions<br />

which if carried out according to the Permitted Action<br />

Schedule, will have no adverse impact on the heritage<br />

values and therefore do not require formal action<br />

assessment and approval. Formal assessment and<br />

approval has been deemed granted for Permitted<br />

Action Schedules under this plan. In other words, most<br />

routine or well defined and planned actions that have<br />

been developed and refined for the place have been<br />

assessed for their ability to comply with the policies<br />

of this plan and their impact on the heritage value<br />

and documented as permitted in these schedules. In<br />

some cases a new methodology for an action has been<br />

developed to improve compliance with the plan. The<br />

Permitted Action Schedules provide a mechanism for<br />

implementing the policies and zone objectives set out<br />

in this plan.<br />

The Permitted Action Schedules provide guidance<br />

for new staff and contractors and a way of reinforcing<br />

appropriate heritage management practice during daily<br />

or regular activities for existing staff and contractors.<br />

Any proposed action that is not outlined in a Permitted<br />

Action Schedule must be referred through a proposed<br />

action form for approval.<br />

New Permitted Action Schedules may be added to<br />

this plan following formal assessment and approval<br />

by a delegate under this plan. The Permitted Action<br />

Schedules are detailed in Part C, Chapter 9.<br />

The Heritage Management Plan Desktop<br />

Interactive<br />

In addition to the hard copy version of the Heritage<br />

Management Plan, a desktop interactive version is also<br />

available for staff and approved users. This desktop<br />

interactive is linked electronically to the<br />

Old Parliament House collection and building database<br />

and other key documents. These links will assist users<br />

to access current relevant information for the day-today<br />

management of the Place. Users can navigate<br />

through the place via maps of each floor which show<br />

the zones; associated links will always be accessible<br />

to the side of the map. From this point, it is possible to<br />

access parts of the Heritage Management Plan or other<br />

relevant documents to:<br />

• find out if a proposed action is permitted in a<br />

particular zone through the Permitted Action<br />

Schedules<br />

• complete an Action Proposal Form<br />

• find an object in the Movable Heritage Zone<br />

• find information in related documents such as<br />

the Old Parliament House Corporate Plan, or<br />

Interpretation Plan; and<br />

• look up specific sections of the Heritage<br />

Management Plan such as the Policies and Strategies<br />

or the Implementation Plan.<br />

Figure 17 shows the links available through the<br />

interactive.<br />

Press Offices in 1985, set up in the 1939 extension to the Press Galleries, refurbished in the 1970s as the ABC Studio<br />

Source: Tanner #198 Old Parliament House Collection

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!