26.08.2015 Views

OLD PARLIAMENT HOUSE AND CURTILAGE HERITAGE MANAGEMENT PLAN 2008–2013

Heritage Management Plan 2008-2013 - Museum of Australian ...

Heritage Management Plan 2008-2013 - Museum of Australian ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9. Caterers Permitted Action Schedule<br />

Part C – Implementation Tools<br />

206 Old Parliament House and Curtilage Heritage Management Plan <strong>2008–2013</strong><br />

■ ■Policy 7.2.3 Where Old Parliament House management leases parts of the place, Old Parliament<br />

House management must ensure that the heritage values of the place are protected through:<br />

a. compliance with the EPBC Act (sections 341ZE and 324ZA).<br />

b. a lease or Memorandum of Understanding that contains appropriate clauses.<br />

c. a lease purpose which is compatible with the heritage values.<br />

d. a lease purpose which is consistent with corporate vision of Old Parliament House.<br />

■ ■Policy 7.3.1 Old Parliament House management must include a provision in all leases at Old Parliament House<br />

that ensures ongoing access to leased areas for conservation, maintenance, monitoring and bona fide<br />

research purposes.<br />

This schedule has been developed in line with all relevant OPH plans and policies, including the OPH Collection<br />

Management Policy.<br />

2 WHAT THIS SCHEDULE COVERS<br />

2.1 ACTIVITIES COVERED BY THIS SCHEDULE<br />

Activities associated with planning and managing and undertaking catering within OPH building and curtilage.<br />

2.2 WHO IS AFFECTED BY THIS SCHEDULE:<br />

This schedule affects the activities associated with:<br />

■■Catering staff working in OPH<br />

3 DEFINITIONS<br />

■■For the purposes of this schedule, ‘Catering staff’ is taken to include a person or business<br />

that provides food goods or services under terms specified in a contract with OPH.<br />

■■Housekeeping is maintenance through cleaning and preventative conservation.<br />

■■Handling is physically moving objects over both very short and longer distances.<br />

■■Curtilage is the area surrounding the building within the National Heritage Listed boundary.<br />

4 WORKING IN OPH<br />

4.1 GENERAL<br />

The overarching principle when working and planning catering activities within the OPH Building and Curtilage,<br />

is ensuring heritage fabric is protected.<br />

4.2 CATERING<br />

Catering staff should:<br />

■■Be fully briefed before commencing work at OPH. A copy of the Caterers Permitted Action<br />

Schedule should be issued and returned signed before commencement of catering activity.<br />

■■Visit the site prior to commencing contract and undergo a Heritage Awareness Training session for all<br />

catering staff. Continually have Heritage Awareness Training refreshers for new and existing staff.<br />

■■Provide attendants at doors and bottlenecks to assist and protect surfaces, doors are not to be left unattended or<br />

allowed to be wedged open.<br />

■■Ensure safe storage of catering equipment so that heritage fabric is not damaged.<br />

■■Seek approval for the process used to set up and pack up catering equipment and materials from Heritage staff.<br />

OPH will:<br />

■■Provide Heritage Awareness Training.<br />

■■Ensure contractors are aware of speed, parking and traffic restrictions in the area.<br />

■■Loan heritage tables, chairs and other furniture items so long as the furniture is correctly handled and<br />

maintained.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!