II. Implementation Plan<br />

Part C – Implementation Tools<br />

244 Old Parliament House and Curtilage Heritage Management Plan <strong>2008–2013</strong><br />

Policy Specific task Responsibility Priority Timeframe Annual<br />

report<br />

comment<br />

1.1<br />

Principal<br />

management<br />

documents<br />

1.1<br />

Principal<br />

management<br />

documents<br />

1.2<br />

Conservation<br />

processes<br />

1.2<br />

Conservation<br />

processes<br />

1.4 Retention<br />

of fabric in situ<br />

1.5 Removing<br />

heritage fabric<br />

1.6<br />

Intrusive fabric<br />

1.9<br />

Treatment<br />

of specific<br />

components<br />

of the building<br />

fabric<br />

1.9 Treatment<br />

of specific<br />

components<br />

of the building<br />

fabric<br />

1.9 Treatment<br />

of specific<br />

components<br />

of the building<br />

fabric<br />

1.9 Treatment<br />

of specific<br />

components<br />

of the building<br />

fabric<br />

Review and update the<br />

Heritage Management Plan.<br />

Review other Old Parliament<br />

House planning and management<br />

documents. Identify areas of<br />

inconsistency with this Heritage<br />

Management Plan and rectify them.<br />

Provide a program to upgrade<br />

and update statements of<br />

value for individual spaces<br />

within the zones based on an<br />

assessment of priority needs.<br />

Prepare an annual prioritised heritage<br />

research and assessment program,<br />

informed by the risk analysis and<br />

condition of values assessment.<br />

Develop floor covering management<br />

and replacement guidelines.<br />

Ensure all removed fabric is<br />

documented and stored appropriately.<br />

Prepare a plan to identify, remove<br />

and remediate intrusive elements<br />

(for example post 1988 additions).<br />

Research and develop a palette of<br />

colours appropriate to different spaces<br />

and components of the place for<br />

repainting and maintenance work.<br />

Develop and implement a Permitted<br />

Actions Schedule for painting and<br />

the preparation of exhibition spaces.<br />

Monitor and modify if necessary,<br />

the UV and visible light levels<br />

from the skylights.<br />

Seek conservation expertise to review<br />

the exterior fabric report (Connell<br />

Wagner 2001) with particular<br />

attention to experimental and nontraditional<br />

works recommendations.<br />

Manager<br />

Heritage<br />

Managers<br />

Heritage,<br />

Building &<br />

Business<br />

Manager<br />

Heritage<br />

Manager<br />

Heritage<br />

Managers<br />

Heritage &<br />

Building<br />

Managers<br />

Heritage &<br />

Building<br />

Managers<br />

Heritage &<br />

Building<br />

High By June 2013<br />

Medium By June 2009<br />

High By June 2009<br />

High By June 2009<br />

Low By June 2010<br />

Medium<br />

As necessary<br />

Low By June 2012<br />

Manager Heritage Medium By June 2011<br />

Manager Heritage High By June 2008 Completed<br />

Manager Heritage Medium As necessary<br />

Managers<br />

Heritage &<br />

Building<br />

Medium<br />

As necessary