Forms for Walls 245

FIGURE 9-11

Forms for wall of circular tank, 30 ft or more in diameter.

ww.EasyEngineering.n

vertically. Horizontal and inclined radial braces, spaced 6 to 8 ft apart,

should be installed to secure the inside form in position.

The inside form should be erected first, complete with wales and

braces. Form ties are installed along each wale adjacent to each stud.

Because of the low strength of the flat wales, ties must be installed

adjacent to, instead of between, the studs. The outside form is then

erected, and the tie holders are secured against the wales.

Figure 9-12 illustrates the method of constructing forms for a

circular tank whose diameter is less than 30 ft. Vertical planks, usually

FIGURE 9-12

Forms for wall of circular tank, less than 30 ft in diameter.