Forms for Columns 301

3 / 4 '' plywood

Alternate

clamps 90°

2 × 4 battens

Square

corners

(b) Isometric view of

square column

ww.EasyEngineering.n

With 2 × 4 flat

(a) Plan view of square

column

FIGURE 10-6 Column form with steel clamps and steel wedges. (Source: Dayton

Superior Corporation)

shown are for the column clamps only. Additional checks of the

sheathing must be performed to determine the limiting clamp

spacing based on the strength and deflection and of the sheathing

(see Example 10-2).

Example 10-5

Use Table 10-4 to determine the spacing and number of column

clamps for a 20-in. square column 10 ft high. The sheathing will be

¾-in.-thick Plyform with 2 × 4 vertical wood battens.

Using the full hydrostatic pressure of the concrete on the forms,

the maximum lateral pressure will be:

From Eq. (3-1), P = wh

= (150 lb per cu ft)(10 ft)

= 1,500 lb per sq ft