31.01.2023 Views

Formwork for Concrete Structures by R.L.Peurifoy and G.D- By EasyEngineering.net

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Downloaded From : www.EasyEngineering.net

Forms for Columns 309

(A)

(A)

(D)

AA

(D)

AA

BB

BB

DD

DD

CC (B)

CC

(C)

Step 1

(C)

Step 2

Open all locks from bottom to top

on three corners (A, B and C). Corner

(D) may be opened last, or remained

closed to allow panels (AA and DD) to

be moved as a pair.

After all locks are open at corners

A, B and C, remove panel (CC).

Pull left side of panel away first,

push left end of panel (BB) open

to free chamfer on right end of panel

(CC).

ww.EasyEngineering.n

(B)

(A)

(D)

AA

BB

DD

(B)

(C)

Step 3

Remove panel BB in same manner

as panel CC. Remove AA and DD

as a pair, or open all locks at comer

D and remove each panel separately.

FIGURE 10-13 Removal of adjustable wraparound column forms. (Source: Gates &

Sons, Inc.)

column sizes of 10 to 30 in., in increments of 2 in. The modules may be

stacked to the desired column height and attached together to secure

adjacent modules. Only three bolts are required per 8-ft-high form. No

outside angle corners are required. Figure 10-15 shows combinations

of the modular system to accommodate various column heights.

Downloaded From : www.EasyEngineering.net

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!