290 Chapter Ten

Downloaded From : www.EasyEngineering.net

L

W

W

L

(a) Plan view of rectangular column form

A

B

(b) Isometric view of square column form

FIGURE 10-2 Column sheathing of plywood with vertical wood battens.

ww.EasyEngineering.n

Tables for Determining the Maximum Span Length of

Plyform Sheathing

Table 10-2 gives the maximum span lengths using Eqs. (10-7) to (10-10)

for Class I Plyform with short-duration load, less than 7 days. The values

are shown for single span, two spans, and multiple spans applications.

The maximum span lengths for the Plyform sheathing shown in Table 10-2

applies to conditions where the panels are installed in the vertical direction;

therefore, the panels are placed in the weak direction for transferring

the concrete pressure horizontally between vertical wood battens.

The span length is the maximum permissible horizontal distance

between the vertical battens that are used to support the panels.

Table 10-3 gives the maximum span lengths using Eqs. (10-7) to

(10-10) for Class I Plyform with short-duration load, less than 7 days.

The values are shown for single span, two spans, and multiple spans

applications. The maximum span lengths for the Plyform sheathing