254 Chapter Nine

Downloaded From : www.EasyEngineering.net

wood walers to the plywood sheathing. The loop cone form tie is placed

between two cam-lock brackets, and a 2 × 4 or 2 × 6 horizontal waler is

placed on top of each cam-lock bracket. The vertical strongbacks are

locked in place against the backs of the cam-lock brackets with the stiffback

cams. The stiff-back cam connects to ears on the back of the camlock

bracket to lock the forming system in place. The self-centering plastic

cone form tie is crimped to prevent turning in the concrete wall. It

has high-density polyethylene cones for easy breakback of 1 or 1½ in.

This cam-lock forming system uses readily available materials,

¾- in.-thick plywood sheathing and 2 × 4 or 2 × 6 S4S lumber for horizontal

wales or vertical strongbacks. Plywood panels are predrilled with

¹³⁄16-in. holes to receive the ends of the form ties. As shown in Figure 9-21,

ww.EasyEngineering.n

FIGURE 9-21 Suggested form details for 16-in. tie spacing in each direction.

(Source: Gates & Sons, Inc.)