31.01.2023 Views

Formwork for Concrete Structures by R.L.Peurifoy and G.D- By EasyEngineering.net

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

374 Chapter Twelve

Downloaded From : www.EasyEngineering.net

3"

6 7 / 8 " 6 7 / 8 "

3"

24"

6 7 / 8 " 6 7 / 8 "

30"

(a)

2'0" Minimum

1 3 / 4 " Round hole

1 1 / 2 × 3 3 / 4 " Obround hole

24" or 30"

Telephone Power Computer

(b)

ww.EasyEngineering.n

FIGURE 12-11 Cellular units for floor system: (a) cellular units in 24- and 30-in. widths;

(b) isometric view of cellular unit. (Source: H. H. Robertson Company)

After alignment, the cellular units are attached to the decking

before the placement of concrete for the floor slab. Figure 12-12 shows

the installation of a floor cellular system.

Selecting the Proper Panel Unit for Cellular-Steel

Floor Systems

Several manufacturers produce units having properties similar to

those presented in the preceding section. Because a variety of panel

units of cellular-steel panels is available, it is necessary to select a section

that has adequate strength and stiffness for a given condition.

With the span between supporting steel beams and the total load

Downloaded From : www.EasyEngineering.net

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!