266 Chapter Nine

Downloaded From : www.EasyEngineering.net

FIGURE 9-32 Installation of Jahn cornerlock for forming outside corner.

(Source: Dayton Superior Corporation)

ww.EasyEngineering.n

along with the Jahn “C” brackets and snap ties. Normal spacing of

the strongbacks is 8 ft on centers (Figure 9-33).

Figure 9-34 illustrates three alternatives for the attachment of

adjoining upper and lower panels for large wall heights.

Installation of the second lift of plywood is illustrated in

Figure 9-35. The lower plywood is raised into position. The sheet is

nailed to the joint cover wale while the plywood panel is held in place

with a short 2 × 4 spacer block, snap tie, and Jahn “C” bracket. As

additional panels are set, they are nailed to the joint cover wale, securing

them to the previously installed panel with a Jahn plywood

holder. The snap ties, brackets, and wales are installed, working from

the bottom to the top of the panel.

FIGURE 9-33 Installation of strongbacks. (Source: Dayton Superior Corporation)