31.01.2023 Views

Formwork for Concrete Structures by R.L.Peurifoy and G.D- By EasyEngineering.net

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

420 Chapter Fifteen

Downloaded From : www.EasyEngineering.net

Railings

Post

Toeboard

Catwalk workdeck

Slipform workdeck

Double joists

1 / 2 " ø bolt

Wire rope slings

ww.EasyEngineering.n

Catwalk bracket

- by scanada -

Wire rope slings

(1) 7 / 8 " ø

bolt

Slipform

Railings

Post

Toe board

Finisher’s workdeck

FIGURE 15-4 Details of working floor and scaffold assembly for slipforms. (Source:

Scanada International, Inc.)

of the forms. If the jacks are overloaded, the upward movement of

sections of the forms may not be uniform, which can cause distortions

in the concrete structure. Usually, the jacks should be spaced

from 6 to 8 ft apart along a wall.

A hydraulic jack is illustrated in Figure 15-2. A smooth steel

jack rod, its lower end in the concrete, passes upward through the

Downloaded From : www.EasyEngineering.net

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!