24.01.2013 Views

Download - Freiwald Software

Download - Freiwald Software

Download - Freiwald Software

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

!<br />

156<br />

Northville<br />

Hidden Yard<br />

Southtown<br />

Diagram 110: Track Plan of the Sample Layout<br />

The main line, i.e. the loop that connects “Hidden Yard” and “Southtown”, will be operated<br />

automatically under full control of the Dispatcher. The branch line from “Southtown”<br />

to “Northville” will be operated manually.<br />

In the following the necessary steps to control this layout are explained. TrainController<br />

is installed with a set of sample files called STEP1.YRR to STEP6.YRR. Each of<br />

these file corresponds to the content of one of the following sections. By loading these<br />

files into TrainController you can reconstruct yourself, how the particular steps are<br />

performed.<br />

Step 1: Creating the Switchboard<br />

The first steps are creation and drawing of the switchboard.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!