01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Description Measure Proposed Target<br />

Weekdays:<br />

30% on base routes<br />

20% on other routes<br />

Cost Recovery<br />

% of operating costs recovered from fares and<br />

Measure I fare subsidies<br />

Weekends<br />

20% on all routes – Saturday<br />

15% on all routes – Sunday<br />

Recovery Time<br />

Route Selection<br />

The time between when a bus arrives at the end of the<br />

line to when it begins the next trip schedules as a<br />

cushion to ensure schedule adherence, timed transfers<br />

and bus operations within posted speed limits<br />

Roads and streets that routes will operate along<br />

Overall Average<br />

25 %<br />

Depending on route-specific operating conditions, sufficient<br />

additional time should be built into the schedules as a cushion<br />

to ensure schedule adherence, timed transfers and bus<br />

operations within posted speed limits. A minimum of 10%<br />

recovery time should be incorporated into route schedules.<br />

Buses will only operate along streets engineered to facilitate<br />

safe and effective bus operations. Turning radii, street<br />

widths, bus size and overhead clearances must be<br />

considered in this assessment.<br />

July 11, 2007 131

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!