IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Needs Assessment – Identified transit needs for the <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong><br />

SRTP framework from demographic and travel data review, stakeholder<br />

consultation and service evaluation.<br />

• Service <strong>Plan</strong> Preparation – Preparation of fixed route, OmniLink and Access<br />

service plans for three scenarios – Scenario 1: Financially Constrained,<br />

Scenario 2: Partially Constrained, and Scenario 3: Unconstrained.<br />

• Financial <strong>Plan</strong> Preparation – Performed a financial capacity analysis,<br />

developed a fare policy and a series of operational and capital financial plans in<br />

conjunction with each scenario service plan.<br />

• <strong>Plan</strong> Review and Approval – Recommended plan was reviewed with <strong>Omnitrans</strong><br />

Board members, management and staff, and the public prior to finalization and<br />

approval by the <strong>Omnitrans</strong> Board.<br />

Figure 1-1: <strong>2008</strong>-<strong>2013</strong> <strong>Omnitrans</strong> SRTP Process<br />

1.15 Ongoing Studies and Initiatives That Will Impact This SRTP<br />

1.15.1 OTHER OMNITRANS STUDIES & INTIATIVES<br />

FY 2004 – FY <strong>2008</strong> Fare Policy and Implementation <strong>Plan</strong> (03/05/03) – The plan developed a series of<br />

fare policy objectives, and recommended fare policy and an implementation plan to guide <strong>Omnitrans</strong> fare<br />

policy decisions over the period FY 2003/04 to FY 2007/08. The development of the <strong>2008</strong>-<strong>2013</strong><br />

<strong>Omnitrans</strong> SRTP Financial <strong>Plan</strong> included a review and assessment of the FY 2004 – FY <strong>2008</strong> Fare Policy<br />

and Implementation <strong>Plan</strong> recommendations in the finalization of a fare policy.<br />

The Systemwide <strong>Transit</strong> Corridor <strong>Plan</strong> for the San Bernardino Valley – The plan identified seven key<br />

transit corridors for the introduction of higher quality transit service (higher frequency, express or BRT<br />

services) to attract choice riders and effect a positive transit mode shift. Major transit corridors include<br />

Corridor 1 (E Street), Corridor 2 (Foothill East), Corridor 3 (Foothill West), Corridor 4 (Mountain & Euclid),<br />

Corridor 5 (San Bernardino Avenue), Corridor 6 (Holt & Fourth Street), and Corridor 7 (Grand & Edison).<br />

Corridor 1 was identified as the highest priority corridor with the planned implementation of the E Street<br />

July 11, 2007 12