01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

• Proportion of the population under age 16 (youth per square mile).<br />

• Proportion of population below the poverty level per square mile.<br />

• Proportion of households with no vehicle per square mile.<br />

The higher the population or job density and the higher the proportion of elderly, youth, households with<br />

incomes below the poverty level or without a private vehicle, the higher the TOI. The higher the TOI, the<br />

greater the potential transit market as reflected in a higher per capita transit ridership. Higher transit<br />

productivity generally results when service is provided along corridors or between nodes with higher TOI.<br />

Figure 4-7 and Figure 4-8 provide illustrations of the <strong>Omnitrans</strong> fixed route system (2006) in relation to a<br />

Residential TOI and high concentrations of residential and job density. For a larger version of these<br />

maps, see Appendix H.<br />

July 11, 2007 68

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!