01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

9. NEEDS ASSESSMENT/COA FINDINGS<br />

The following needs assessment was based on a detailed line-by-line analysis conducted in the Summer<br />

and Fall 2006 on the 30 bus routes that were in place at that time. As a result of the assessment, several<br />

deficiencies were corrected in the May 2007 service adjustment including the elimination of one route.<br />

The needs assessment below reports on the 2006 findings and notes instances where corrective actions<br />

were taken in May 2007.<br />

In May 2006, <strong>Omnitrans</strong> provided 30 fixed bus routes including 18 routes in the East Valley, 11 routes in<br />

the West Valley and 1 regional express route. The fixed routes include 15 base routes in the main travel<br />

corridors, 14 local routes in the various cities, and 1 regional express route. In May 2007, <strong>Omnitrans</strong><br />

discontinued one local route and now has 29 fixed routes.<br />

Passenger on/off counts, a passenger survey, stakeholder consultation and the historical performance of<br />

the bus routes were used to identify deficiencies in each route and route section. These on/off counts<br />

were taken on typical weekdays on all vehicles in May 2006; they provided boardings, alightings and<br />

loadings by stop by route, which enabled the current ridership performance (as measured by passengers<br />

per revenue hour) to be determined for each route and route section. The passenger survey was taken in<br />

April 2006 and provided demographic and travel information on the passengers riding each bus.<br />

Stakeholder consultation occurred over the July-October 2006 period and involved city officials, transit<br />

policy makers, <strong>Omnitrans</strong> management and operating staff, and the operators of the 30 routes. The<br />

consultation provided information on the strengths and weaknesses of each route and advice on the<br />

improvements that should be considered to improve the efficiency and effectiveness of the transit<br />

system’s routes and services.<br />

The transit system’s fixed routes are reviewed in this chapter based on the route and service standards<br />

that were in place in May 2006. The operating characteristics and performance of each route are shown<br />

in Figure 9-1 through Figure 9-4. Appendix G provides profile maps for each fixed route.<br />

9.1 Route Assessment (Fixed Route)<br />

9.1.1 EAST VALLEY ROUTES<br />

The East Valley (east of I-15) has nine base routes, nine local routes and one express route, covering the<br />

cities of Colton, Fontana, Grand Terrace, Highland, Loma Linda, Redlands, Rialto, San Bernardino, and<br />

Yucaipa. The routes use 89 buses and have an average overall weekday performance of 29 passengers<br />

per hour as compared to the weekday standard of 25 passengers per hour.<br />

Base Route 1: ARMC-San Bernardino-Del Rosa – This East Valley base route serves Colton and San<br />

Bernardino. It provides 15-30 minute daytime and 30-minute evening service on weekdays, 45-minute<br />

daytime service on Saturdays, and 30-minute daytime service on Sundays. On weekdays, the south<br />

section in Colton provides 15-minute service all day in the Valley/Mt. Vernon corridor between the<br />

Arrowhead Regional Medical Center and the Fourth Street <strong>Transit</strong> Mall in downtown San Bernardino; it<br />

has an above standard performance of 35 passengers per hour. The north section in San Bernardino<br />

provides 30-minute service in the Waterman corridor between the <strong>Transit</strong> Mall and Del Rosa; it has a<br />

significantly above standard performance of 36 passengers per hour. When considering Route 5 in the<br />

Waterman corridor, the corridor receives a combined 10-20 minute service on weekdays and 20-minute<br />

service on weekends. The route has a declining ridership, with monthly average passengers per revenue<br />

hour of 32 on weekdays, 23 on Saturdays, and 29 on Sundays, which are above standard for a base<br />

route.<br />

July 11, 2007 170

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!