01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IBI GROUP SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Figure 7-9: OmniLink Service Utilization<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Trips per Capita*<br />

Total unlinked passenger trips<br />

/ service area population<br />

0.38 0.45<br />

Passengers / Revenue Hour<br />

Completed one-way<br />

passenger trips / scheduled<br />

revenue vehicle hour (limited<br />

to trips by registrants)<br />

4.57<br />

(to meet 10% farebox recovery)<br />

Chino Hills – 2.20<br />

Yucaipa – 3.15<br />

Vehicle Loadings<br />

Maximum passenger loads per<br />

bus<br />

Loads not to exceed 100% of<br />

seated capacity. No standees.<br />

No current standard<br />

*Based on Chino Hills and Yucaipa service area population<br />

Figure 7-10: Amount of OmniLink Service Provided<br />

Description Measure Proposed Target (FY <strong>2008</strong>) FY 2006 Actual<br />

Revenue Hours / Capita*<br />

Total annual revenue hours /<br />

service area population<br />

0.12 0.16<br />

*Based on Chino Hills and Yucaipa service area population<br />

July 11, 2007 151

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!