01.11.2014 Views

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

Short Range Transit Plan 2008-2013 - Omnitrans

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

IBI GROUP<br />

SHORT RANGE TRANSIT PLAN REPORT<br />

OMNITRANS COMPREHENSIVE OPERATIONAL ASSESSMENT<br />

& SHORT RANGE TRANSIT PLAN<br />

Access Service, selected performance standards are included as performance expectations in the<br />

respective service contracts and provide benchmarks for the evaluation of contractual compliance.<br />

7.1 Fixed Route Performance Standards<br />

Proposed fixed route performance standards are organized into service standards, and effectiveness,<br />

efficiency, and labor productivity indicator categories. The proposed standards are summarized in Figure<br />

7-1 through Figure 7-4. Included are a definition of the measure, the proposed target and (where data<br />

are available) an indication of actual performance in FY 2006.<br />

July 11, 2007 143

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!